How can I use electric trucks economically in long-haul transport?
The short answer: by charging the truck at its own depot in the evening instead of charging at public charging stations along the route. If the truck turns around halfway, it will be back at its own location by evening . This makes depot charging possible—and that is exactly what determines whether an electric truck in long-haul transport makes money or loses money.
Why electric trucks fail in long-haul transport today
It’s not the technology. Battery-electric tractor-trailers are available and perform as intended in everyday operations . They fail due to three factors inherent in traditional long-haul operations:
- Range vs. Daily Distance. A continuous long-distance trip exceeds the range; recharging is necessary along the way.
- Public charging infrastructure. It is growing, but for heavy-duty vehicles it remains sparse and isn’t available everywhere the route passes through.
- Downtime and cost of charging on the road. Public charging is significantly more expensive than self-supplied power, and charging time is paid time without revenue.
Under these conditions, the electric truck is economically inferior to the diesel truck—not because of the vehicle itself , but because of its operational profile.
Depot charging makes all the difference
A point of reference for the public price: Milence, the European charging network for heavy-duty commercial vehicles, has been charging a base rate of 0.399 € per kWh (net ) in Germany since January 1, 2026 (Source: Milence, as of September 2026). Those who charge at their own charging station generally pay significantly less—exactly how much, , depends on their electricity supply.
If the vehicle charges overnight at its own location, the three disadvantages are reversed: The electricity rate is your own, not that of a charging station. The charging time counts as downtime— —during which the vehicle isn’t being driven anyway. And availability depends on your own charging infrastructure— —not on the occupancy of third-party charging stations.
This significantly changes the math—and brings forward the point at which the higher purchase price pays for itself.
Why this doesn’t work in traditional long-haul transport
Depot charging requires that the vehicle be at the depot in the evening. In traditional long-haul transport, it’s on the road for days at a time. That’s precisely why depot charging has so far been limited to local transport and company-owned transport.
How shuttle service changes the operational profile
In shuttle service, the vehicle does not travel the entire route, but rather goes to the meeting point and back. The round trip is short, predictable, and ends where it began. The cargo still travels the full distance—it simply changes vehicles.
This transforms a long-distance route into a mission profile suited for battery-electric vehicles: limited daily mileage, known destination, overnight charging at the company’s own charging station. The MANSIO Logistics Suite replans these routes daily, and takes vehicle parameters and charging infrastructure into account—a capability developed in the DRivE research project.
How to Calculate Your Start-Up Costs
To perform a reliable calculation, you’ll need four figures: your electricity price at the depot—which is 0.399 € net per kWh, as per the public rate at —the investment in your own charging infrastructure at , the daily mileage for the planned route, and the number of vehicles that can share a charging point. The framework for this calculation—personnel, vehicle, toll, and energy costs per kilometer—is disclosed at on the “Advantages” page.
The Self-check shows which of your relations can be intersected with such orbits.